News and Information

ASIMCO Camshaft (Yizheng) Co., Ltd.

Anhui Hualing Guests Visit ASIMCO Camshaft

On April 24, 2020, a delegation of four, including Jiang Yiqun, Executive Deputy General Manager of the Engine Division of Anhui Hualing Automobile Co., Ltd., and Yang Xuewen, Deputy Chief Engineer and Head of Materials, visited ASIMCO Camshaft (Yizheng) Co., Ltd. The visit was warmly received by Chen Aiguo, General Manager of the company, Zhou Quan, Deputy General Manager of Sales, and Dai Hongxing, Deputy General Manager of Technology and Quality. In April, as the epidemic situation gradually stabilized and major OEMs resumed work one after another, Hualing Automobile also entered its peak demand season. The engine division of Hualing Automobile reported a substantial increase in demand over the past few months and urged ASIMCO Camshaft to ensure 100% on-time delivery of orders, while also setting specific requirements for the development progress of the modular Camshaft. As the exclusive Camshaft supplier for Hualing Automobile’s engines, our company has maintained stable production and improved efficiency while actively fighting the epidemic, making every effort to meet customer needs. Following discussions, the two parties have agreed on a new delivery schedule. With the aim of creating value for customers and enhancing product design quality, the modular Camshaft developed by our company for Hualing engines has successfully passed the customer’s bench testing and is scheduled to begin small-batch deliveries. Mr. Jiang and his delegation from Hualing Automobile’s engine division expressed their recognition and appreciation for our company’s production operations and the application of new product technologies, further strengthening the excellent cooperative relationship between ASIMCO Camshaft and Anhui Hualing Automobile.

Keywords:

20/05/07


Cherishing Youth and Striving Diligently — A Record of Engineer Zhang Jianming’s Ten Years with Camshaft

Zhang Jianming, male, joined ASIMCO Camshaft (Yizheng) Co., Ltd. in July 2010 and currently serves as a responsible engineer in the Technical Department. This year marks his tenth year at ASIMCO Camshaft, during which he has consistently demonstrated unwavering dedication and diligence through his practical actions. The primary responsibilities of the Technical Department include new product R&D, process optimization, production support, and on-site cost-reduction initiatives. To maximize the company’s profitability, each engineer places particular emphasis on developing new products. Since being assigned the C13 Camshaft development project in 2011, Comrade Zhang Jianming has exemplified a tireless, perfectionist work ethic. From receiving customer drawings to producing prototypes, from prototypes to small-batch trial production, and finally to PPAP approval—no detail is overlooked. He personally oversees every step, even sacrificing his holidays to remain at his post, working tirelessly on the shop floor. Sparks flying and the roar of machine tools have become the dominant theme of his life; unafraid of hardship or fatigue, his sole conviction is to successfully complete project PPAP reviews and SOP mass production. Leveraging his solid technical expertise, Comrade Zhang Jianming skillfully applies advanced product planning and development processes, successfully managing multiple camshaft projects and generating over RMB 20 million in additional annual sales for the company. Notable examples include the localization project for the Shanghai Volkswagen C13 series camshafts, the Anhui Hualing CM6D series camshaft project, the China National Heavy Duty Truck camshaft project, and the Cummins M-series camshaft project—all key initiatives that have earned high praise from customers and delivered impressive results. In addition to new product projects, Comrade Zhang Jianming has also successfully implemented numerous process and quality improvement initiatives. With deep expertise in camshaft machining processes, he optimized the cutting path for 8mm grooving tools used in rough grooving of steel camshafts, significantly improving efficiency and tool life, thereby saving the company nearly RMB 1 million annually. Furthermore, he frequently shares his knowledge and insights by training engineering technicians in programming JUNKER JUCAM5000 and KOPP SN series follow-up grinders, strengthening the entire engineering team and earning him the respectful nickname “expert” among newly hired staff. “Don’t marry an engineer—year-round factory life leaves little time for personal matters; we see each other rarely through spring, summer, autumn, and winter, and when we do return home, it’s usually with a bag of dirty clothes.” Due to his demanding workload and the fast-paced nature of new product development, Comrade Zhang Jianming has had little time for personal life and only started his own family at the age of 32. In October 2019, as projects such as the U.S. RMEP ISB6.7 compliant with China VI standards, Cummins’ global M-series project, and Foton Cummins X12 series entered the critical PPAP phase, Comrade Zhang Jianming resolutely rose to the challenge. To ensure these projects met customer requirements, he meticulously studied every single process, working continuously for two months without a break and practically “living” at the factory. During this period, his daughter was born; yet his commitment to his work led him to temporarily put aside the need for family companionship. His longing for his child and sense of guilt toward his wife only fueled his determination to work even harder. Aside from three meals a day, he devoted all his time and energy to his duties, completing a project that would normally take a month in just one week. Comrade Zhang Jianming’s upright character and persistent work ethic have earned him widespread admiration from his colleagues. He is not one for grand words or excuses; instead, he simply works from dawn till dusk, constantly racing against output and quality. While excelling in his own role, he also actively supports colleagues in completing their projects, approaching new team members’ assignments with the same seriousness and dedication. When bottlenecks arise on the shop floor, he promptly steps in to help, responding immediately whenever production calls—rain or shine. He is also an optimistic, positive young professional who, despite his busy schedule, often quips: “I can wear my work uniform from Monday to Sunday; I’ll wash it today and change into another tomorrow, saving a lot of money on clothes throughout the year.” There is no high or low in one’s profession—what matters is steadfast resolve. How can a man who seeks ambition ever find leisure? When asked, “After so many years of work, have you ever felt overwhelmed and wanted to give up?” Comrade Zhang Jianming replied, “No. No matter how long the journey, you can reach the end one step at a time; no matter how short the distance, you cannot arrive without taking the first step. As long as you make up your mind and persistently follow your convictions, nothing can truly defeat you.” In 2018, Comrade Zhang Jianming was honored as an Outstanding Individual within the Yangzhou Science and Technology Association system for his exceptional abilities and remarkable achievements. Work is arduous, but sweat is accompanied by joy; life is always fair—effort is rewarded, and the more you strive, the greater your gains.

Keywords:

20/04/20


Shangchai E-Series Project Team Visits Camshaft

On April 8, 2020, a three-member delegation from Shanghai Diesel Engine Co., Ltd.—including Wang Jiabao, Procurement Manager of the E-Series Project Team; Wang Zan, Engineer at the Technical Center; and Wang Xu, Quality Engineer—visited our company for a preliminary audit. First, Zhou Quan, Deputy General Manager of our company, gave a detailed introduction to the enterprise. Xu Zhongwang, Director of the Technical Department, then engaged in thorough communication and discussion with the representatives from Shanghai Diesel Engine regarding the technical solution, implementation plan, and product characteristics. During the meeting, both sides finalized arrangements concerning the production line for the Shanghai Diesel Engine E-Series project, capacity preparation, and equipment capabilities. Given that our company has consistently maintained a leading position in supply quality for Shanghai Diesel Engine, the latter specially convened a special meeting on E-Series supply specifically for us. The meeting decided to streamline the supply process and accelerate the delivery of Camshafts for the E-Series, with small-batch sample deliveries expected by the end of April. Following the meeting, Chen Aiguo, General Manager of our company, accompanied the clients on a factory tour and provided an overview of the production lines. The development of Camshafts for Shanghai Diesel Engine’s E-Series will broaden our sales scope within Shanghai Diesel Engine and lay an even stronger foundation for future cooperation between the two parties. We are committed to living up to Shanghai Diesel Engine’s trust, keeping pace with their initiatives, fully supporting their new-product development and supply needs, creating greater value for them, and working hand-in-hand with Shanghai Diesel Engine to achieve mutual success.

Keywords:

20/04/20


Chairman Jiao Visits ASIMCO Camshaft Co., Ltd.

On the morning of December 28, 2019, Mr. Jiao Chengyao, Chairman of Zhengzhou Coal Mining Machinery Co., Ltd., Mr. Jia Hao, President of the company, Mr. Wang Bin, President of ASIMCO, and three other members of the delegation visited ASIMCO Camshaft Company. General Manager Chen Aiguo presented the company’s five-year plan and the 2020 budget. The delegation led by Chairman Jiao toured the production workshop, where General Manager Chen Aiguo briefed them on the production process, lean manufacturing, quality control, and other aspects. Deputy General Manager Dai Hongxing then provided an update on the progress of the modular Camshaft project. Chairman Jiao highly commended the achievements in the development of the Camshaft business and encouraged the team to keep up the good work, benchmark against leading international companies, and strive to grow stronger and bigger.

Keywords:

19/12/31


Unite as One to Win the Tough Battle for High Yields

In the fourth quarter of 2019, market demand rebounded, and domestic OEMs all experienced explosive growth. Following adjustments to its production lines during the summer lull, ASIMCO Camshaft Company streamlined and optimized its resource allocation. Faced with this surge in orders and a heavy production workload, the company implemented various measures to respond proactively. Undaunted by difficulties and never slackening, we consistently upheld the hardworking and courageous spirit of camshaft professionals, united as one to swiftly sound the call for high-output mobilization! Multi-skilled personnel and multi-faceted support: High output not only tests the adaptability of each production link but also the perseverance and determination of every employee. In the face of large volumes and a tight production schedule, on the one hand, the company has made rational resource coordination; as early as the off-season, the production system reorganized and optimized production-line staffing according to the development plan. To minimize the impact of unexpected situations on production, workshops have also focused on cultivating highly skilled, multi-position mobile workers who can quickly adapt to job rotations and seamlessly integrate into various processes. On the other hand, frontline employees work tirelessly and rise to challenges, operating multiple machines per person. Outside the workshop it’s bitterly cold, while inside it’s bustling with intense activity—no complaints or retreats. From the general manager down to second-line section members, everyone is fully supporting frontline production. TPM equipment maintenance is steadily advancing across the company, with monthly company-wide clean-up and protection campaigns for all equipment, effectively ensuring stable operation even during peak production periods. Goal breakdown and implementation at every level: Under high-output conditions, some production lines have already reached full capacity. With orders continuing to grow, the psychological pressure on every grassroots manager is also increasing. In response, the production system breaks down monthly orders into weekly plans, then into daily output targets, followed by shift-level targets, and finally into hourly output for key processes. This hierarchical goal-setting and detailed follow-up ensure that production-line capacity is maximized, so that everyone understands that camshafts are produced one by one by our employees, and that the company’s overall goals are achieved through the small goals of each individual. Working together to brave the rapids and sailing forward with one heart. Faced with the booming market, all departments of the company are united and going all out to meet the challenge of high output. The more hectic and busy the situation, the more rigorous and meticulous we must be, striving for excellence in everything we do. With safety, production promotion, and order fulfillment as our core priorities, and with high quality and zero defects as our guiding principles, we put everything in service of production, leaving no stone unturned and fighting for every inch of ground, determined to win the final battle of the year and usher in a new chapter for the new year!

Keywords:

19/12/25


ASIMCO Camshaft Successfully Completes the 2019 Supervisory Audit of Its Quality and Environmental Management Systems

From November 14 to 16, 2019, our company conducted the annual surveillance audits of its Quality Management System and Environmental Management System. The audit team from Hande Certification Services Co., Ltd. carried out a systematic review of the operation of these two management systems, with participation from company leadership and heads of all departments. Prior to the audit, senior management held detailed discussions with the audit team to provide a comprehensive overview of the company’s background, development history, and performance since the beginning of the year. Following the opening meeting, the formal audit commenced, covering areas such as the metalworking workshop, casting workshop, laboratory, and warehouse area. With the full cooperation of department heads, the audit of each process was completed on schedule. At the closing meeting, the audit team concluded that the operation of our company’s two management systems complies with the relevant standard requirements, commended the improvements achieved in system operation, and recommended maintaining the certification. At the same time, the audit team noted that certain areas for improvement still exist in our system operations; however, these minor shortcomings do not detract from the overall strong performance, as our practices in workshop management, on-site control, and process development remain at a high level compared with industry peers. Continuous improvement is an ongoing commitment. Moving forward, we will rigorously address the issues identified during the surveillance audits by pinpointing gaps, ensuring effective implementation, strengthening weak areas, and reinforcing strengths in management processes and compliance with established procedures. Through these efforts, we aim to substantially enhance the management of our Quality and Environmental Management Systems, maintain steady progress, and ensure the sustained, effective, and healthy operation of both management systems.

Keywords:

19/12/02


< 1...121314...32 >

Follow us

QR code

ASIMCO Camshaft (Yizheng) Co., Ltd.

Recruitment Phone:+86-514-80857900/83429619
Sales Phone:+86-514-80857906/80857907
Procurement Phone:+86-514-80857930/80857931

Fax: +86-514-83429699

Email:liut@asimco-camyz.com

Address: No. 8, Shuanghuan Road, Yizheng Automotive Industrial Park, Yangzhou City, Jiangsu Province